Scheduling error E: KM:133

0 Kudos

At the time I ran CKMSTART, I got the error E:KM:133, there was no further explanation of the error. However the screen moved to the next stage and let me schedule the job. I did the scheduling, like choosing date and time. The next step of 'check' did not give me any error. However as I did the 'confirm' it gave the error E:KM133, the color code of the error was brown and not red. I hit the enter 2 more times I got an update in the bottom of the screen to say the scheduling job is ready. I did not understand the job is scheduled or ready for scheduling. I hit execute at this time I was taken back to the a initial screen.

I looked at the system monitor and it said the error is only a warning, the icon color was green. The job is not scheduled though and I still get the message 'set material ledger productive for valuation area zyx.

Any help on this please.

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
Active Contributor
0 Kudos

Have a look at OSS notes 1462878 and 2928280