Hi

Our accounting is 01.04.2014 - 31.03.2015 has already been closed and audited.

There is an asset which was transfered during Feb.2015 but the cost centre change has not been done. Should the cost center change be Feb.2015, or 01.04.2015(we have not done the depreciation run for this year)

Regards

Anuradha

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Dec 10, 2015 at 04:25 AM

    Hi Anuradha,

    As you said, the last year was closed and also audited. Then better to maintain the new cost center with validity from 01.04.2015, in the time dependent data of the asset master by AS02.

    Regards,

    Mukthar

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 10, 2015 at 06:29 AM

    Mukthar,

    Many thanks.

    Regards

    Anuradha

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.