Skip to Content
avatar image
Former Member

Batch Management Indicator Missing_Material Master

Dear Team,

I am trying to activate the indicator "Batch Management" (Check box) in material master "Purchasing View". But I could not able to see the "Batch Management" check box in "Purchasing View". Is there any configuration required to enable this check box in material master?

Thanks

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Nov 03, 2015 at 06:02 AM

    Dear Selva,

    Go to t-code OMSR and for required matertial type make  MARA-XCHPF field optional for desire t-code. Currently it is in display mode thats whay u can not change.

    Regards

    Muhammad Umar

    Add comment
    10|10000 characters needed characters exceeded

  • Nov 03, 2015 at 06:36 AM

    Hello Selva,

    Please follow the below step for the batch management indicator field in Material master purchasing view

    1. First check the field group number for respective filed group:

         Filed name : MARC-XCHPF and selection group: 75

    2. Go to Tcode: OMS9 Tcode: enter the field selection group as "75" with field name "MARC-XCHPF"

    3. Now Select the field ref and as per your requirement and you can set the Indicator as Hide/Display/Req entry/Opt entry for Tcode: MM01/mm02/mm03 or for specific material type HALB/FERT/ROH.

    Please check in your system and confirm the same.

    Regards

    Umesh Mali

    Add comment
    10|10000 characters needed characters exceeded

  • Nov 03, 2015 at 05:57 AM

    Hello Selva Kumar,

    The batch management can be activated in 3 ways as per standard SAP

    1.Client level

    2.plant level

    3. material level

    and there are certain configuration steps you have maintain in the SPRO

    so please search in SDN for batch management configuration you will get lot off threads

    http://scn.sap.com/thread/1480632

    http://scn.sap.com/thread/554728

    http://www.erpgreat.com/materials/config-setting-in-batch-management.htm

    Regards,

    Venkatesh..

    Add comment
    10|10000 characters needed characters exceeded