on 12-16-2020 10:01 AM
Hi,
I am trying to generate a CPI job monitoring report for the jobs that have run in last 12 hours. I am using the below API call to fetch the details. <<TMN>>/api/v1.
I want to understand is there a way to actually get the iflow status. Because sometimes in monitoring the iflow shows as completed but if we drill down in debug mode it would have failed in one of the steps. Can it be possible to capture that logs and report it correctly .
THanks Sriprasad for the update. Let me check on this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.