on 02-22-2024 2:44 PM
Hi,
I am trying to create a PVM waterfall in a SAC story.
My issue is the formatting. I want Contribution Y and Contribution X to be one colour, then positives green and negatives red. However, contribution just seems to follow whatever I set the positive values as.
One of my issues is everything is a separate measure. This is because they are all separate calculations.
Is there any way I can format this to achieve me desired result of both contribution values being the same colour?
User | Count |
---|---|
83 | |
11 | |
10 | |
8 | |
7 | |
7 | |
6 | |
6 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.