on 11-16-2020 10:07 AM
Dear Experts,
We plan an upgrade of our SAP PI dual stack 7.4 to the a SAP PI 7.5 dual usage.
We want to rewrite some of our ccBPM to nwBPM.
Is there any restrictions developping nwBPM with our PI 7.4 licence?
In other words, do we need to buy another licence than our PI licence if we want to develop nwBPM?
Thanks.
Regards.
Hi Mohamed
Unlike traditional CCBPM, NWBPM is not a part of PI anymore. But it is now a separate module of Netweaver. And that is why we call it Netweaver BPM. We can develop a CCBPM from Integration repository. But coming to NWBPM, we do all development part in Netweaver Developer Studio and then deploy it to server. We can use CCBPMs only in dual stack PI. Coming to Single stack PI systems, we use NWBPMs.
"You do not require a separate license key for your standalone SAP NetWeaver Developer Studio. You require a license key if you have installed a J2EE Engine in addition to SAP NetWeaver Developer Studio"
https://blogs.sap.com/2016/02/12/sap-pi-nwbpm-from-the-scratch/
Thanks , Sankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
83 | |
10 | |
10 | |
9 | |
7 | |
6 | |
6 | |
6 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.