on 10-06-2016 10:03 AM
Hello Experts,
we are performing a SAP EHP8 Upgrade running on a SAP ASE 16.0 SP02.
In the Execution Phase we are getting the following error:
"Severe error(s) occurred in phase MAIN_SHDIMP/SUBMOD_CP2SHD/SUBMOD_DIFFCP2SHD/DIFFEXPABAP_CIGPR!
Last error code set: Non single errors (code > 😎 found in logfile 'DIFFEXPPI.ELG'
1 error during parallel execution of processes, check 'DIFFEXPPI.ELG' for details
2 processes failed, check 'TP.*' for details ERROR: Detected the following errors:
# F:\SUM\abap\log\SAPECCC751.<SID>:
4 ETW686 end copying of "R3TRPROG/<SUBDIRECTORY>/TRANSFER_TEMPLATE_SEL".
3 ETW685Xstart copying of "R3TRPROGZABAP2XLSX_DEMO_SHOW" ...
4 ETW000 [ dbrepo ,00000] ***LOG BYQ=>invalid parameters passed to database interface
4 ETW000 [ dbrepo ,00000] ***LOG BY0=>sdate = '20160907'
4 ETW000 [ dbrepo ,00000] ***LOG BY0=>stime = ' '
2EETW000 sap_dext called with msgnr "2": 2EETW000 ---- db call info ----
2EETW000 function: db_repo_ext 2EETW000 fcode: SET_RDIR_ALL
2EETW000 tabname: SOURCE
2EETW000 len (char): 42 2EETW000 key: ZABAP2XLSX_DEMO_SHOW AM
2EETW000 retcode: 2
4 ETW690 ROLLBACK "24722" "490822"
...skipped 1 more lines.
Please see DIFFEXPPI.html for more information."
-----------------------------------------------------------------------------------------------------------------------------------------------------------
TP.002
"SAPup> Starting subprocess in phase 'DIFFEXPABAP_CIGPR' at 20161006103933
ENV: DBMS_TYPE=syb
ENV: JAVA_HOME=C:\Program Files\Java\jre7
ENV: PATHEXT=.COM;.EXE;.BAT;.CMD;.VBS;.VBE;.JS;.JSE;.WSF;.WSH;.MSC
ENV: PATH=F:\SUM\abap\exe;C:\Windows\system32;C:\Windows;C:\Windows\System32\Wbem;C:\Windows\System32\WindowsPowerShell\v1.0\;C:\Program Files\Java\jre7\bin;D:\usr\sap\<SID>\DVEBMGS00\exe;D:\usr\sap\<SID>\SYS\exe\uc\NTAMD64;\\<SYSTEMNAME>\sapmnt\<SID>\SYS\global\syb\NTAMD64\sybodbc;D:\sybase\<SID>\OCS-15_0\bin;D:\sybase\<SID>\OCS-15_0\dll;D:\sybase\<SID>\OCS-15_0\lib3p64;D:\sybase\<SID>\OCS-15_0\lib3p;D:\sybase\<SID>\ASE-15_0\bin;D:\sybase\<SID>\ASE-15_0\dll;D:\sybase\<SID>\ASE-15_0\jobscheduler\bin
ENV: RSEC_SSFS_DATAPATH=\\<SYSTEMNAME>\sapmnt\<SID>\SYS\global\security\rsecssfs\data
ENV: RSEC_SSFS_KEYPATH=\\<SYSTEMNAME>\sapmnt\<SID>\SYS\global\security\rsecssfs\key
ENV: SAPSYSTEMNAME=<SID>
ENV: dbs_syb_dbname=<SID>
ENV: dbs_syb_no_ext_check=1
ENV: dbs_syb_port=4901
*DBENV: dbs_syb_schema=SAPSR3
ENV: dbs_syb_server=<SYSTEMNAME>
ENV: rsdb_ssfs_connect=1
*DBENV: (auth_shadow_upgrade)
PWD: F:\SUM\abap\tmp
EXECUTING F:\SUM\abap\exe\tp.EXE "pf=F:\SUM\abap\var\DIFFEXPPI.TPP" r3e SAPKCCC751 -s <SID>
This is F:\SUM\abap\exe\tp.EXE version 380.40.05 (release 742, unicode enabled)
This is F:\SUM\abap\exe\R3trans.exe version 6.25 (release 742 - 15.03.16 - 20:16:01).
unicode enabled version
2EETW000 sap_dext called with msgnr "2":
2EETW000 ---- db call info ----
2EETW000 function: db_repo_ext
2EETW000 fcode: SET_RDIR_ALL
2EETW000 tabname: SOURCE
2EETW000 len (char): 42
2EETW000 key: ZABAP2XLSX_DEMO_SHOW AM
2EETW000 retcode: 2
F:\SUM\abap\exe\R3trans.exe finished (0012).
INFO: No client specified on command line. Taking client 0 from E070C.
tp finished with return code: 12
meaning:
A tool used by tp aborted
SAPup> Process with PID 86864 terminated with status 12 at 20161006103938!"
Any suggestions according to this error?
Best regards
Jakob
Hi Kaushik, thanks for your response! I already updated tp and also the complete kernel... How can i update SUM without breaking up the upgrade? best regards Jakob
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Manas,
thanks for your reply! Looks like the issue is solved.
Problem was the program "ZABAP2XLX_DEMO_SHOW", because my collegue copied it to the system but did not activate it.
So, i had to unlock the system as described in note 1901463 - How to unlock the SAP system to perform correction(s) during an upgrade. and activate all parts of the program.
Then i locked the system again and the "Execution"-Phase continued.
Thanks again for the help!
Best regards,
Jakob
DIFFEXPPI.html
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CUSTOMER, ADD ON, GENERATED, SP, AND MODIFIED OBJECTS (ABAP)-Export ERRORS and RETURN CODE in SAPECCC751.<SID>
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
3 ETW685Xstart copying of "R3TRPROGZABAP2XLSX_DEMO_SHOW" ...
4 ETW000 [ dev trc,00000] Thu Oct 06 12:53:14 2016
4 ETW000 [ dbrepo ,00000] ***LOG BYQ=>invalid parameters passed to database interface
4 ETW000 [ dbrepo ,00000] ***LOG BY0=>sdate = '20160907'
4 ETW000 [ dbrepo ,00000] ***LOG BY0=>stime = ' '
2EETW000 sap_dext called with msgnr "2":
2EETW000 ---- db call info ----
2EETW000 function: db_repo_ext
2EETW000 fcode: SET_RDIR_ALL
2EETW000 tabname: SOURCE
2EETW000 len (char): 42
2EETW000 key: ZABAP2XLSX_DEMO_SHOW AM
2EETW000 retcode: 2
4 ETW690 ROLLBACK "24722" "490822"
2EETP200 Export with errors, request will not be imported
1ETP111 exit code : "12"
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
As per your 1st post, it seems that you need to to check the tp.exe in your kernel location, if required you can also separately download the upgraded tp version, uncar & paste in the kernel folder & then again re-run this job. Generally Code 8 or 12 means some components or some product/part missing. If not solved after this then, re-download the SUM Tool(updated one) & then run this task after that.
Thanks,
Kaushik
User | Count |
---|---|
83 | |
10 | |
10 | |
9 | |
7 | |
6 | |
6 | |
6 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.