cancel
Showing results for 
Search instead for 
Did you mean: 

DTP - Extract all green requests with Delta Extraction Mode

0 Kudos

Dear SAP Comunity,

Is there an option to load green requests from one DSO to another if there is a red request before?

In Full Extraction mode, there is an option to do this, but this is not available

in Delta Extraction mode.

Please see Pictures 1 and 1.a.

We are facing the following issue - Picture 2.

Since we have multiple DTPs for different LEs, we would expect that the error in one flow would not affect the other, even though they are loading from the same DSO.

Is there a way to load green requests after red ones in Delta Extraction Mode?

In this way, we can reach full parallelization of our processes.

Thank you in advance!

picture-1a.jpgpicture-1.jpgpicture-2.jpg

Marko Tadic

Accepted Solutions (0)

Answers (0)