on 03-30-2022 2:15 PM
i have configured a process in the process tile.
this process contain three steps. the first both are manuelly steps like check keyfigure.
the last step is an application start. with this job, the heuristic should start automatically.
this step is planned one day later as the other two steps.
as condition to start I choose "if the previous job closed" and as end "if startjob is ended"
but it is not starting automatcally, if I set the second step on "closed" and the process stepp not finished, if the heurisitc run is ended.
What can i do, the the last step start automatically and stopped automatically.
Thanks in advance
Oliver