cancel
Showing results for 
Search instead for 
Did you mean: 

SAP BPC 7.5 NW SP09 - full optimize never ends. Job can not be stopped

former_member699486
Participant
0 Kudos

Hi experts,

we sent a full optimize process in order to compress an application but it never finished.

I noticed that through BW transaction RSPC the process chain: Full optimization stops in "Collapse box" step and become red.

so the cube were locked and can not be used. we checked through in BW TE SM50 that process is in "Running status"

I tried to stop it through BW TE SM37 but can not be done due its status.

Please any idea how to stopped it and how solved full optimization issue?

thanks

Accepted Solutions (1)

Accepted Solutions (1)

former_member200327
Active Contributor
0 Kudos

Try cancelling it from SM50 (with core or without core). Never run Full Optimization for compression, run Light Optimization if you need to compress a cube.

Gersh

Answers (1)

Answers (1)

former_member699486
Participant
0 Kudos

Thanks Gersh,

That were solved it