on 06-21-2017 7:23 AM
Dear Experts.
Here's our process:
Here's my question:
If QC take all the quantity of first GR to do sampling, and this inspection lot is not released by QA, during this time, warehouse do a second GR, then there'll be a new inspection lot generated.
But if QC only take partial quantity of first GR to do sampling, and no matter this inspection lot is released or not, the second GR will go to same inspection lot.
I'm very confused: why would system work like this? Is there any special scenario? Thanks.
Regards
Steven
The system makes the determination based on the system status changing from SPRQ to SPCO. This also sets a indicator in the QALS table that stock has been fully posted.
When the stock posting complete indicator is set, then new inspection lots are created. It does not consider whether a UD has been made or not.
So in your case, because you posted out all the stock via sampling, the indicator gets set becasue QC consumed all of the receipted material.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
9 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.