on 11-02-2016 11:46 AM
Hi
In a delivery I have 1 piece of material A which has a serial no. profile which states that the serial no. must be packed into the handling unit.
The problem is that physically material A is contiain in 3 handling units. How can I then insert the serial no. OF course I could create one handling unit which contains the material and then pack the serial no. into that handling unit. Tehn in addition to that create two dummy handling units. But this solution is not good.
I could also pack 1/3 piece into each handling unit but then it is not possible to pack the serial no. into the handling units.
So what should we do?
User | Count |
---|---|
92 | |
9 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.