cancel
Showing results for 
Search instead for 
Did you mean: 

Link PLM spec to MIC

Former Member
0 Kudos

Experts,

I have an inspection plan for a Material. I have a single MIC in this plan. I would like to have the target value for the MIC populate from one of the VAT in the specification for the Material. I am aware that we can maintain the target value in QP01. Is it possible to link a MIC with VAT value from a Material spec?

BR,

Aspire

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Experts,

Can you please tell me if anyone has faced this scenario to link PLM Material spec VAT value to QM MIC Target value?

BR,

Aspire

Former Member
0 Kudos

Hi Sourabh,

Thanks a lot for your reply. I was referring to PLM Spec assigned to a Material in Basic data view of the Material master(RMWB Tcode). If I have a VAT in RMWB Material spec, is it possible to pull the VAT value from the spec and map it to Target value for a MIC?

BR,

Aspire

sourabh_maheshwari2
Active Participant
0 Kudos

You need to use either Material Specs or Insp Plan

You cannot have a mix

In your case, maintain the same limit as you have in the Mat Specs, or better, use the Mat Specs instead if possible

One possibility is you use the same MIC in your Mat Spec and Insp. Plan as well

This should solve the problem