cancel
Showing results for 
Search instead for 
Did you mean: 

In material inspection, no inspection lot can be created for material with batch management

dussaxi
Explorer
0 Kudos

A customer return with batch managed material is received and a split is done on goods receipt booking. Now we have a inspection in MSR_INSPWH with two items (900001 and 900002), but now inspection lot can be created for either of this positions.

 

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
Active Contributor
0 Kudos

Check SAP notes 1837582 and 2781570