on 05-06-2019 8:43 AM
In the E1EDT10 segment of a SHPMNT05 idoc, there are field names ISDD, ISDZ, NTANF and NTANZ.
We are confused whether we advise the business to use ISDD and ISDZ, or NTANF and NTANZ for the following three times.
1. Loading Start (Qual 003)
2. Shipment Completion (Qual 004)
3. Shipment Start (Qual 005)
What would be the difference in either of these cases?
I am an SD functional consultant, please bear with me if any of this is not logically right.
After a bit of research, ISDD, ISDZ are the fields used for the actual occurrence of the event.
NTAxx is used for the planned occurrence of the event.
This has explained the situation and the right fields to use within the segment.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
9 | |
7 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.