cancel
Showing results for 
Search instead for 
Did you mean: 

FAGLGA15 - Will over write the Profit center of the receiver with Sender PC

former_member218253
Active Participant
0 Kudos

Hi all

I have a requirement to move cost from a cost center with a default profit center of X to 2 other Profit centers. FAGLGA15 shows the correct receivers but the posting routine overwrites the PC with the PC of the cost center. There is a not saying this is standard system behaviour How do I assess costs from a one profit center to many? Note even says substitution is not possible. So in the S/4 Hana world is assessment not a valid requirement? How can get around FAGLGA15 issue of overwriting the Receiver PC?

Thanks in advance

Accepted Solutions (0)

Answers (1)

Answers (1)

slimi
Discoverer
0 Kudos

Any news about this issue?