ERRATIC PP REQUIREMENTS For ROH Material

jeyakrishnan1
Discoverer
0 Kudos

While running MPR for Finished good at plant level. Semifinished material in Sub contracting process. After MRP system is generating more PR qty then the Required qty. MRP Type-PD, Lot size-EX, Minimum QTY is maintained-5000 for ROH Material. The System is Running Background job for PR creation, MRP run and Delete Unreleased PR, Multiple PR to Single PR in every Week. Please give some solution why system create too much qty for ROH material.

Accepted Solutions (1)

Accepted Solutions (1)

DerekDing
Product and Topic Expert
Product and Topic Expert
0 Kudos

If you set “Minimum Lot Size” = 5000 in the View of MRP1 for the material.

Pre-condition: there is no stock for the material.

When the requirement Qty <= 5000, the PR will be created after MRP running, and PR Qty = 5000.

If the requirement Qty > 5000 , the PR will be created after MRP running, and PR Qty = Requirement Qty.

jeyakrishnan1
Discoverer
0 Kudos

Hi Derek Ding,

Thank you for Your Solution and quick response also.

Answers (0)