Hi,

We have some issue regarding BOM not reexplodes when dispatch in CM25.

Though we have a solution that to do an enhancement to CM25 where will change the BaPI MD_PLDORD_CHANGE, where we will copy the dispatch date to the explosion date, then after saving the change will reflect.

My question is after we do the change, the change is already reflected in the explosion date, but the components for the planned order are not reexploded based in the explosion date. Is there any setting in the BaPi how it will be done? As far as doing it manually, we can reexplode the bom in MD12 by the Explode BOM button.

Regards,

JF

Accepted Solutions (0)

Answers (1)

Answers (1)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi John

The documentation of this BAdI on SE18 provides the following information:


  • Note that in using this method, all fields of the structure CH_PLAF are offered for change, but that not all of the fields of this structure can be sensibly changed for further processing. Generally, there is no guarantee that the changes made with this BAdI will be supported in the further processes. No liability is taken for any mistakes which occur in subsequent processing after changes made using this method.
  • Avoid the following changes to planned orders within this method, since they could lead to inconsistent datasets:
    • Changes to explosion-relevant data (quantities, dates, production versions, and so on), since no new BOM explosion occurs after the method has run

Therefore, this BAdI was not developed for such use and, even if you change the explosion date, there will be no BOM explosion.

BR