Can anyone who have gone through a UNICODE conversion provide a high level plan and timeline that was spent converting the system to unicode. We need an estimate of the conversion effort (not incl. an upgrade). The system is ECC 5.0
Thanks,
Prashanth
06-01-2006 4:50 PM
06-01-2006 4:41 PM
Hi
plz refer this link
<b>https://forums.sdn.sap.com/post!reply.jspa?threadID=53214</b>
reward if useful
06-01-2006 4:50 PM
Hi Ganesh, no luck with the link you provided. Redirects you to https://www.sdn.sap.com/irj/sdn/collaboration.
06-01-2006 4:43 PM
Hi Prashanth,
There are some tools in the market which would do it for you.
UPTIMIZER is one such tool (Developed by Intelligroup).
You can contact me at ravit@intelligroup.com for for info.
Regards,
Ravi