06-09-2010 11:24 AM
Hello Geeks,
I want to set the status of the Outgoing IDOC to 03 , without doing a "COMMIT WORK" . Actually only after i do a commit work are my IDOCs dispatched. But with a commit work the IDOCs are dispatched immidiately. I do not want to dispatch it immidiately. Instead i want to hol the IDOCs till my LUW finishes , but the IDOC status should be set to "03" instead of "30".
Thanks,
Bashir
06-09-2010 11:42 AM
Hi,
After collecting all the idocs which are under status 30, run the program RSEOUT00 to change the status from 30 to 03.
If you want to do this process automatically then set the program RSEOUT00 in background.
Regards,
Lokeswari.