01-14-2008 3:05 PM
Hi all,
I try to configure the adobe interactive forms for webdynpro abap, and in the first steps to configure this I run the FP_TEST_00.
Some times it work's and I can see the PDF ... but very frequently the sistem hangs up.
can anyone help us as soon as possible, please.
Thanks in advance,
David
01-15-2008 6:26 PM
David,
We were running into a similar issue with trying to run our W2's (the job would run sometimes and sometimes it would just hang, but I never could get it to produce all the pdf documents the job was suppose to return.) My basis folks (I'm on the HR side) opened a ticket with SAP and eventually found that our swap file was not large enough. You might take a look at OSS note 644209. This is apparently what they did to make it work. Hope this helps!
Gail