12-13-2006 12:30 PM
I have setup the selection variable for posting date with current date minus 1 for transaction code FBL5N. When I schedule the background job, the posting date for this report remains static. Thus the dynamic date calculation is not working as expected. For example, if I set this job to run daily from 01.12.2006, it runs daily but the posting date on it does not change, thus same report output.
I do not think this issue needs the setting for TVARV and the standard SAP functionality should work. Checked OSS notes too. We are on Basis 620 and APPL 470.
Any ideas will be highly appreciated.
12-13-2006 12:33 PM
Hello,
Follow these steps:
You can do it as follows:
After executing create the variant
Step1: Click on save
Step2: Enter variant name
Step3: In 'Field attributes' select/Click 'Selection variable (i.e 'L') related checkbox.
Step4: Click on 'Selection Variable' button
Step5: Then select 'Selection criterion' as 'D' (the middle one)
Step6: Click on down arrow and select 'Current Date'.
This will set system date variant.I think this will solve your problem.
Kindly reward if helpful.
Vasanth
12-13-2006 12:37 PM
Have you created a dynamic variant, where you have configured a parameter for dynamic selection.
The process of how to do the same can be found here
http://help.sap.com/saphelp_nw2004s/helpdata/en/c0/98038ce58611d194cc00a0c94260a5/content.htm
Regards
Ravi
Note - Please mark all the helpful answers
03-24-2008 5:41 AM
Hi Sanjeev,
I am also facing Same problem, after i save the varient by giving the dynamic date calculation variable in dynamic selection screeen its not reflecting while i schedule the job
and if i again invoke the attributes the check box is flagged off after for the dynamic date calculation, if you found the answer for this please let me know
Regards
Kiran Telur
E-mail:Kiran.Telur@gmail.com