Skip to Content
author's profile photo Former Member
Former Member

Urgent Change - 'To Be Tested' status

Hi,

When action 'Pass Urgent Correction to Test' is performed the statuse changes to 'To Be Tested'

Some time Import failes & still status changes to 'To Be Tested'. Ideally it should not change the status as Import failed.

How can I make sure that status 'To Be Tested' will appear only when import is successful ?

Regards

P Kumar

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on May 13, 2013 at 05:04 AM

    Hi Kumar,

    By default, the check for import to QA system is maintained as WARNING. If you want a hard stop at this stage, change the settings from WARNING to CANCEL and also maintain the status as E0004 in the user status column (last column in the screenshot)

    You can navigate to ChaRM Framework - Make setting to transaction types - Assign Conditions.

    Hope this helps.

    Regards,

    Imran


    SMHF_Config.jpg (80.9 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.