on 05-12-2013 6:49 AM
hi,
i need advice related to subcon.
raw parts assigned to FG. in GR, i can see finish goods with movement type 101 and raw parts with movement type 543.
1) there are 2 accounting document generated. 1 is the consumption of raw, this accounting doc is understandable.
another accounting doc which is for finished goods, i a bit confused why there are 2 additional entry of subcon expenses. the entry is :
dr inventory
cr grc
cr subcon expense cogs
dr subcon expense cogs
2) during GR, there is an expandable icon at finished goods. when expand, can see raw with movement type 543.
may i know what tcode i can see the relationship of raw to finished goods for this subcon?
thanks
Hi Sam,
In a normal Sub-Contracting scenario below is the complete accounting entry assuming if two components are used for the finished goods:
PO raised for TABLE and the amount mentioned in PO is for the services/assembly charges by sub-contractor vendor are Rs. 100
BOM 1Table (Rs. 450)= 1 top (Rs.200) + 4 legs (Rs.150) + 100 (Service charges for assembly)
at the time of GR
Table (FG) stock BSX +/Dr. =450
GR/IR WRX -/Cr. =100
Cost of Goods Sold BSV -/Cr. =450
Services Purchased FRL +/Dr. =100
top stock comp-I BSX -/Cr.=200
Consumption of top GBB +/Dr.=200
Legs stock comp-II BSX -/Cr.=150 (mov. type 543)
consumption of comp-II GBB +/Dr.=150 (mov.type 543)
Regards,
Anoop Singh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi sum,
when you receipt the FERT,you will consume the ROH,therefor you have said the first doc,
and while you will pay process charge,also is the PO value;
the third is the FERT value, it contains Roh value and the process charge ,so there are 3 doc
best regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sam,
1.Only one accounting document for GR posting. Those are called accounting entries. showing two entries for one operation is a finance concept (for every entry system will show in Dr and Cr) double book entry concepts etc & there should be two more accounting entries in subcontracting process.
Cost of Goods sold (BSV) & Purchased services(FRL).
2. For a subcon po, you can see the FG and raw material link in ME23N > PO > Item level Material data tab > click on components.
Other standard link is use tcode CS03. enter your FG material and plant and type (1 or 3)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.