Performance Based Plan

Former Member
0 Kudos

Hi PM Experts,

I have created 2 measuring points and  2 mesuring documents for an equipment. Then i have created mutiple counter plan (IP43) for that equipment wrt  these 2 counters. I have scheduled the plan then i see call object created based on annual estimate divided by 365. Client requirement is call object need to be created based on cycle defined in the plan wrt the Logic OR & AND operation on the multiple counter plan. Kindly suggest how to do so??

Regards

Sapneswar

Accepted Solutions (1)

Accepted Solutions (1)

former_member187991
Active Contributor
0 Kudos

hi

call will be generated based on the cycle you have defined in the multiple counter plan , if you have selected the OR type system will call either any one counter reaches , if you select AND option call will get generated only when the 2 counters reached the value

can you give exact requirement on the same

regards

thyagarajan

Former Member
0 Kudos

You are right. Requiement is call object should be created based on the cycle defined in the multiple counter plan wrt to OR & AND logic.

Ex - I have created  2 measuring points. i.e. Equipment Running in Hours, Distance Coverved in kilometers.

Also created 2 measurement documents for the equipment.(i.e. 2 Running Hour & 5 Kilometer Distance).

Then create multiple Counter Plan for the equipment with cycles (i.e.  Running Hour Cycle 5 & Distance Covered 10 Kilometers.) OR logic selected.

Then Schedule the Plan by clicking start button. Call object created based on annual estimate divided by 365. rather Call object should be created once either the Counter "Running Hour" reaches 5 or "Distance" reaches 10.

Regards

Sapneswar

Answers (1)

Answers (1)

former_member201296
Contributor
0 Kudos

Hi Sapneswar

Go to the T code IP02 for your maintenance plan change mode there in the maintenance plan scheduling parameters there you maintain parameter as late complication /early complication as per your requirement.

Thank you

Former Member
0 Kudos

Hi

During scheduling by IP10 have you release the call? On releasing call,system will trigger order based on

annual estimate & previous date of previous maintenance(cycle start date).