May 09, 2013 at 11:46 AM

Routing Component allocation - Direct production

31 Views

I have a BOM and a routing for material A (with operations 0010, 0020, 0030). There are several fantom materials in this BOM (100001, 100002 and 100003), all of them assigned to operation 0020.

1) I change the special procurement type in material master 100001 to '52' because I want this material to work with direct production. The change is performed with a change number on a future date.

2) I change the special procurement type for 1000001 to 52 in the BOM of A because the system doesn't do this automatically. The change is performed with a change number on a future date.

When I display the routing without a change number, componenet allocation remains unchanged. If however I display the routing with the change number used above, I see that the component llocation to routing 0020 has been lost for material 1000001. In table PLMZ there are no records for that change number. What is the table where the 2 different versions can be viewed?

Thanks in advance

Michalis