Skip to Content
0
Former Member
May 06, 2013 at 09:45 AM

Upgrade stucked in phase SHADOW_IMPORT_INC

79 Views

We are upgrading the SAP ERP 6.0 system from source release EHP5 to target release EHP6 using NZDM facility provided in SUM tool SP07. Currently we are at SHADOW_IMPORT_INC phase in preprocessing stage of upgrade. Upgrade is stucked at this phase from 3rd May, 2013. Last log was written on 12:24 PM on 3rd May, 2013.

Below are the details of infrastructure:

Operating System: Windows 2008 64 bit

Database: Oracle

SUM tool version: 1.0 SP07

Total Ram: 8 GB

CPU: 2 core

Source release: ERP 6.0 EHP 5

Target release: ERP 6.0 EHP 6

As per scn link : As per scn link -> http://scn.sap.com/thread/1834278

i have already tried incresing parallel import processes to 4 in SHDALLIMP profile and DEFAULT profiles existing in SUM/abap/var directory, however this did not helped.

Please let us know how can we speed up the SHADOW_IMPORT_INC phase.