work center's migration by POIM

I should migrate work centers from R3 to R3 and I would prefer not to use LSMW. I tried doing it by POIM but all I obtained is an IDOC I can't upload by the POIL. I think the problem concerns with the procedure (ED00, ED08) you have to use for the message LOIWCS (work center for POIM)...

How can I upload that IDOC?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jan 21, 2008 at 07:53 AM

    Hey I am also facing same problem.

    Did you get any solution?

    Thanks

    Shital

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.