Production order identification from MRP

Hi,

We want differenciate production order from mrp and non mrp production order. how to differenciate between them?

Please help for differenciation.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Posted on May 06, 2013 at 06:55 AM

    Hi,

    The Production order which are derived from MRP will have the planned order number assignment in (AFPO-PLNUM) as it is routed from the planned order. Also you can check the order material relevancy to MRP with field AFPO-DNREL which shows the MRP relevancy of Header material to Production Order.

    Regards,

    Shekhar

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 06, 2013 at 02:22 PM

    Hi,

    I also have gone through this requirement from business and i mapped it as below. It works only if you run the MRP in the background. If you run it manually in foreground, the below solution will be of no use. Check the below points.

    1. Create a new user ID with only restricted authorizations (only MRP relevant). For eg: MRPAUTO
    2. Schedule the MRP background jobs using this ID. Nobody can create planned orders using this ID as they will not have authorization to this ID.
    3. Pass AUFNR to AFPO table and get the planned order number (PLNUM) or simply check in CO02/CO03.
    4. Pass the planned order to PLNUM of PLAF table and check the PUSER. If it is the MRPAUTO, then it is system created otherwise manual.

    May be the SAP would have provided a much better option than this. Proceed with this if you don't have any other options.

    Regards,

    Krishna Chandra

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 06, 2013 at 08:09 AM

    Hi,

    MRP run will generate planned order which in further can be converted in Production orderand during conversion the planned order no is assigned to Production order.

    Also you can differentiate the Planned order created by MRP and Manually thru MD11 by checking * against Planned order in MRP element data column in MD04 list.

    Regards

    Anupam Sharma

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 22, 2014 at 09:00 AM

    can you define me the procedure how to have production order from planned order//////??????

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 23, 2014 at 07:11 AM

    ok when we release the PO then further we confirm CO11N

    then the procedure kindly come up with proper sequence

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.