Apr 26, 2013 at 08:43 AM

Revision level check during result recording

120 Views

Hi all,

We are using revision level in material master, BOM and all
task list. Requirement is like this: In material master revision level is 01,
BOM and inspection plan is created with revision level 01. I have created new
revision level in material master as 02 and forgot to change inspection plan
with revision level 02, lot generated in this case should not released
automatically.

In my current system, though revision level in material
master and inspection plan is different, system is releasing lot. Please
suggest how can I restrict lot release if revision level on material master and
inspection plan is different?

Thanks.

Regards,

Mayur