Skip to Content
avatar image
Former Member

BPE_ADAPTER">SYSTEM_FAILURE_INTERNAL

Hello,

  • when i create new integration process object, error occured as following:

       

An Internal GUI error occured.

This function should be called while holding treeLock

( Error  is in attachment )

  • When i cretaed object ant testes BPM process, it gives error in sxmb_moni:

< SAP:Category > XIAdapter </ SAP:Category >

< SAP:Code area =" BPE_ADAPTER " > SYSTEM_FAILURE_INTERNAL </ SAP:Code > < SAP:Stack > An internal error has occurred </ SAP:Stack >
  • Then the sxi_cache transaction gives error:

Unable to refresh  cache contents

Error  during last attempt to refresh cache

Logs:

ERROR com.sap.aii.ibdir.server.abapcache.ErrorHandler: Failure at Cache-Refresh data consumption !!!

  <?xml version="1.0" encoding="utf-8"?><CacheRefreshError><EngineType>_INTEGRATION_SERVER_</EngineType><EngineName>_INTEGRATION_SERVER_</EngineName><RefreshMode>F</RefreshMode><Service><ServiceObjectId>63E3

System is installed PI 7.3.1. dual stack

Thanks

Nurhan

error.png (6.1 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Apr 25, 2013 at 03:09 PM

    Perform full cache refresh and clear all failed BPM process and test.

    If still getting same error then view graphical flow in SXMB_MONI--->BPM monitoring.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      It has been already done. I realised that data cahe in administration tab is missing cache object INTEGRATION SERVER(ABAP) such as in attachment . We use dual stack PI 7.3.1.

      Does it cause a problem?

      cache.png (27.3 kB)
  • avatar image
    Former Member
    Aug 28, 2013 at 03:36 PM

    Hello,

    You need to maintain the role SAP_XI_ID_SERV_USER in particular the S_ICF_ADM and add the role to the user.

    Regards,

    Add comment
    10|10000 characters needed characters exceeded