Dear Experts,
An inspection type is active for inspection lot origin 03.(inspection during production)
The system creates an inspection lot automatically when a production order is released.
But, Our customers do not want this.
Our customers want to create an inspection lot automatically when a each operation is confirmed in co11n.
Is it possible?
If it is possible, how to setting IMG?