Hi, Please help to resolve the issue we are facing presently.

Brief of the Issue: A job "Wheel & Axle Cpl", in which Wheel is pressed into Axle. It consists of Six operations

Viz;0010-Wheel Press, 0020-Turn, 0030-Letter Punch, 0040-Hand Tap, 0050-File, 0060-Brush Paint.

This Job(Material Number) is activated with in process inspection.

The job has to be carried out with a defined parameters and should meet the same. If the defined parameters are not met the job is rejected and the operation needs to be redone for reclaiming the Job to meet the defined parameters. Production order is released for Material number "Wheel & Axle Cpl" and quantity 10 no's, with six operations as explained above. When first operation(Wheel Press) is completed the same is offered for Inspection. Out of 10 No's 8 no's gets passed and 2No's Inspection is rejecting the Job stating non-conformity due to Defined parameters not matching. Now how to create new operation for the same production order for performing 1) De-Wheeling operation and 2) Re-pressing operation, with out disturbing the remaining operations(opn-0020 to 0060) and the operation already performed(Wheel Press) needs to be claimed for payment.