cancel
Showing results for 
Search instead for 
Did you mean: 

Error calculating cost

Former Member
0 Kudos

Accepted Solutions (0)

Answers (2)

Answers (2)

peter_atkin
Active Contributor
0 Kudos

Just to add more info to above.

It looks like you are missing some info on the Costing tab of the Work Centre (TCode IR02).

The standard formula to enter into this tab is SAP008, but that may depend on your system settings.

You will also nee to enter a valid cost centre and activity type here too.

PeteA

Former Member
0 Kudos

Give the formula SAP008 in Costing tab for your activity type.