Hello,
I have following issue:
I want to apply an entry in a Z-table within a macro.
In detail: I have a key figue in a planning book. The value in each bucket of the planning book of the key figure should be mulitplied with a value which can be determined from a Z-table.
Does somebody know how to realize this "connection" between a macro and the entry in a Z-table?
Please reply!
Thanks and kind regards
Heinz