Skip to Content
0
Former Member
Apr 03, 2013 at 05:23 PM

batch level conversion from client to material

353 Views

Hi,

Has anyone ever done a successful conversion of batch level from client to material ? Does it need a conversion program and if yes then what is the name of the program and how is it supposed to be used ?

Also when converting from plant level to material level is it the same program? How would the system convert the batch class as at plant level the class type is 022 and at material and client levels its 023.