on 03-09-2013 9:47 AM
Dear Expert,
Measure of unit cannot be cange after quality inspection plannig of mateiral.
When i cange the MOU given belew error will be appeari and also delete master inspection plan of material.
Routings already exist that are assigned to the material.
Type Group GrC Plnt
Q ********** 1 1000
But
Kinldy eloborate
Please go through OSS note 30656 and search the forum with key word "change base unit of measure"
This was numerous times discussed before
Have a look into our forum rules: http://scn.sap.com/docs/DOC-19331