Dear Expert,

Measure of unit cannot be cange after quality inspection  plannig of mateiral.

When i cange the MOU given belew error will be appeari and also delete master inspection plan of material.

Routings already exist that are assigned to the material.

Type Group    GrC Plnt

Q    **********   1   1000

But

Kinldy eloborate

Accepted Solutions (0)

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

Please go through OSS note 30656 and search the forum with key word "change base unit of measure"

This was numerous times discussed before