Hi experts,

I am trying to configure job scheduling using CPS. I have configured CPS and I am able to schedule and monitor jobs from it but when I go to the job scheduling tab in solman_workcenter I am facing below issues

i. When I create a job request, the product system data is not proper. The installation number is 0000 is one system and the client is some alphanumeric value in the other.

ii. When I try scheduling a job using schedule job option, both the test of trusted and TMW RFCs end up in error. When I check the same in sm59 both seem to be working fine.

Kurztext Error   Diagnose BC-XBP interface communication error.   Vorgehen Contact your system administrator. Check your BC-XBP authorization (example: Role SAP_BC_REDWOOD_COMMUNICATION). Check the RFC connection to the satellite system, with transaction SM59. Check the entries in the application log, with transaction SLG1. Check the XMI log in the satellite system.

We are on solman 7.1 SPS06. Is there something I am missing?

Regards!

Rahul

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi All,

I am getting an error while saving job request in solman 7.1 . Could any one help me out to resolve this issue?Please find the below screenshot of the error message. It is saying that NO LOGICAL SYSTEM SELECTED but I am not sure where do I need to select logical system? please help?

Thanks

Sajin

Martin_Lauer
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi,

is client 001 of system C18 assigned to any Logical Component? Please perform a where-used search with LMDB/SMSY for logical components that contain system C18.

kind regards,

martin

Former Member
0 Kudos

Hi Sajin,

Could you please reply on how you resolved your issue. I am facing same issue.

Regards

P Kumar

Martin_Lauer
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello,

the XBP interface is being used to schedule a job directly into an SAP system.

the SMSE interface (Solution Manager Scheduling Enabler, a.k.a BAE, CPS interface) isbeing used to schedule/monitor SAP CPS jobs.

SAP Note 1729766 "CPS - Solution Manager integration setup" describes how to setup the Solution Manager - SAP CPS integration.

Afterwards you will be able to schedule job in SAP CPS from Solution Manager and to monitor SAP CPS jobs from Solution Manager.

See also:

http://service.sap.com/jsm -> Media Library

https://websmp208.sap-ag.de/~sapidb/011000358700000221292011E/R_SOLMAN71BPO.htm

http://scn.sap.com/community/it-management/alm/solution-manager/blog/2009/05/28/monitoring-job-chain...

http://scn.sap.com/community/it-management/alm/solution-manager/blog/2011/03/16/two-typical-problems...

Kind regards,

Martin

Former Member
0 Kudos

The RFC error is resolved and i am able to schedule jobs now but the request functionality is still not working.