configuration about SRM contract transfer to ECC Scheduling Agreement?

HI,

   I am working in SRM 7.02  and ERP EHP6,  I can transfer  SRM contract to ECC contract by PI successfully.

  But ,I want to transfer SRM contract to ECC Scheduling Agreement. what else configuration I need to do ?

  thanks in advance!

  Jesse

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Mar 05, 2013 at 09:29 AM

    Hi Jesse,

    Transferring scheduling agreements to ECC is still through IDOC process i.e. BLOARD, you need to create document type in ECC for schedule agreement is same as contract document type in SRM.

    Also, you need to choose the document type in Target system at item level of the contract as Sched.Agreement.

    Please go through the thread, http://scn.sap.com/message/13603172 for more information on it.

    Regards,
    Govardhan

    Add comment
    10|10000 characters needed characters exceeded

  • Mar 05, 2013 at 01:41 PM

    HI,

       I set message type BLAORD and COND_A  in ECC,  and make sure the same document type both ECC and SRM.   when I create a contract with Scheduling Agreement distribution in SRM ,  in ECC, I check IDOC by tcode WE05.  and  don't find any idoc. 

      how to send idoc from SRM,  any configuration need  in SRM?

      thanks

    Jesse

    Add comment
    10|10000 characters needed characters exceeded

  • Mar 06, 2013 at 12:28 PM

    HI,

       In SRM, there is not  BLAORD message type ,   I set message type DELINS in both SRM and ECC , but when I created Contract with SA distribution.   any idoc don't be cretaed in SRM.

    how to trigger IDOC creation?

    thanks

    Jesse

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Jesse,

      The idoc resides in ECC , SRM only triggers it.

      There are a few settings you can check.

      1. What is your system landscape settings for system type? I think it should be ERP 4.0 i think.

      2. There is a FM which gets triggered BBP_SAPXML1_CTR_REPLICATION.  Place a breakpoint using wf-batch. In this FM there is acall to an ECC fm called bbpv_contract_transfer enter it and see ehat happens. This ecc fm creates idoc for bloard and conda

      Let us know your findings.

      Regards,

      Naveen

  • Mar 08, 2013 at 09:52 AM

    Hi,

        the SA settings is the same as contract transfering by IDOC ,  but  need to note the BADI that price condition mapping.

      Jesse

    Add comment