Skip to Content
author's profile photo Former Member
Former Member

Locking material till User decision completes

Hi,

I've a requirement in which the user decisions should be sent to users in different roles for changing materials.

Can I lock the material for a particular role still the user decision step is completed.

Please suggest.

Thanks,

Karthika M R

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Feb 28, 2013 at 11:32 AM

    Hello Karthika !

    You can prevent the users from receiving user decision work items who are assuming a particular role.

    Develop a background method or rule to pick the agents who don't belong to a particular role and pass it to the user decision step. This way you'd be able to accomplish the requirement.

    Regards,

    S.Suresh.

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      Then find some customer exit for MM02, where you can write the code like that way that it can be only possible TO execute through MM02 in business workplace based on system fields.

      Then whoever got the workitem in their business workplace they can execute MM02 for that material

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.