Assigned budget value is including taxes

It is desired by the business that the budget estime should be done only for the basic Purchase Order Price. But standard SAP considers the taxes as well if the taxes are inventorized.

Also these taxes do not hit any specific cost element but are hoyying the Stock Local components A/c. Hence it is not possible to "Exclude such cost elements"

Need your help to suggest ways by which assigned value of budget can be changed so that Budget is com[ared only with Basic PO price.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Posted on Feb 28, 2013 at 12:07 PM

    Hi,

    check with fico consultant with tax code because tax code is be link with G/L

    Regards,

    Sanjeev

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 28, 2013 at 01:04 PM

    Hello Nidhi,

    If you cannot configure another account for taxes your requirement is not possible by standard and very very difficult by development.

    Be in mind that if you have a price 400 and 10% taxes all against the same account in controlling you will see 440 then not possible to make the different which is price and which is taxes.

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 01, 2013 at 07:43 AM

    Hi,

    If you want to see separately basic price of PO and tax component value in assigned values then I think it can be achieved.

    Procedure(way through MM side): For respective account assignment category (OME9) Q/P/N you have to configure it in a way that it will allow you to distribute your total cost to various other cost elements/G/L or cost objects. This distribution will take place either on value basis or percentage basis. This part you have to calculate manually i.e. If PO including taxes is 440 out of which 40 is tax component then calculate it manually that 40 is what % of 440 and maintain the same in your PR/PO. Like X% to G/L 'A' and remaining Y% to G/L 'B' .

    In this process you have to talk to your MM and FI guy and ask for their suggestions on it accordingly .

    Regards

    Ankur

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.