Skip to Content

Issue with Java SPS upgrade via SUM tool

Hi All,

Currently we are doing SPS5 Upgrade (Abap+Java) in PI Development system via SUM tool.

In Java we are currently facing an issue

Trouble Ticket Java

Trouble Ticket Report

Update to SAP EHP1 FOR SAP NETWEAVER 7.3

  1. SID................: <SID>
  2. Hostname...........: hostname

Install directory..: /usr/sap/<SID>

SUM directory......: /usr/sap/put/SUM/sdt

  1. Database...........: ORA

Operating System...: UNX

JDK version........: 1.6.0_31 SAP AG

Source release.....: n/a

Target release.....: n/a

ABAP stack present.: true

The execution of step Create stack from stack file of action configure ended in error. Service com.sap.sdt.jspm.service.specifyqueue.SpecifyQueueService failed with message:

Support package stack /usr/sap/trans/EPS/in/SMSDXML_<SID>_20130212060958.427.xml was rejected. For details see scan inbox log in current log directory.

More information can be found in the log file /usr/sap/put/SUM/sdt/log/SUM/CREATE-STACK-FROM-FILE_02.LOG.

Use the information provided to trouble-shoot the problem. There might be an OSS note providing a solution to this problem. Search for OSS notes with the following search terms:

SUM,configure,create-queue,create-stack-from-file,com.sap.sdt.jspm.service.specifyqueue.SpecifyQueueService,class com.sap.sdt.jspm.deployment.queuemanager.QueueManagerException

Our system details are as follows

SAP Version - PI 7.31(Abap+Java)

OS - Sun Solaris 5.10

DB - Oracle 11g (11.2.0.2)

Any help is appreciated......

Regards,

Ram

jingggg.png (39.9 kB)
tingggg.png (40.3 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Feb 19, 2013 at 04:35 AM

    Hi,

    Could you please paste "/usr/sap/put/SUM/sdt/log/SUM/CREATE-STACK-FROM-FILE_02.LOG" log file ?

    Thanks

    Sunny

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 03, 2014 at 08:19 PM

    I had have that problem and solved this ussing the original XML generated by the SOLMAN.

    In my case I have a distributed instalation, but when I look into the stack.xml I have changed it manually changing the hostname from DBHOST to Principal app Server.

    I make this due to I was running the SUM from the Principal APP Server and I believe that SUM verify the hostname where it run. But I was in a error. You can chet that into the log file located into :

    /usr/sap/<SID>/SUM/sdt/log/SUM

    File:

    SCAN_INBOX_0X.LOG for example SCAN_INBOX_02.LOG

    Jan 3, 2014 2:08:04 PM [Info ]: Scanning Inbox for stack definition files...

    Jan 3, 2014 2:08:04 PM [Info ]: Parsing stack definition file /media/SP9-PID/stack.xml...

    Jan 3, 2014 2:08:04 PM [Info ]: SAP-NOTE tag is missing in the stack definition file.

    Jan 3, 2014 2:08:04 PM [Info ]: STACK-SHORT-NAME tag is missing. The CAPTION of the stack will be used as stack name.

    Jan 3, 2014 2:08:04 PM [Info ]: PRODUCT-PPMS-NAME tag is missing. The CAPTION of the product will be used as product PPMS name.

    Jan 3, 2014 2:08:04 PM [Warning]: Software component SAP EHP1 FOR SAP NETWEAVER 7.3 : PI Adapter Engine (Java EE) - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is applicable for system SID: PID and HOST: ccros-sap-ap1, but the current system is SID: PID and HOST: ccsfsapdb02. This software component will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software component SAP EHP1 FOR SAP NETWEAVER 7.3 : Application Server Java - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is applicable for system SID: PID and HOST: ccros-sap-ap1, but the current system is SID: PID and HOST: ccsfsapdb02. This software component will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software component SAP EHP1 FOR SAP NETWEAVER 7.3 : NW Product Description - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is applicable for system SID: PID and HOST: ccros-sap-ap1, but the current system is SID: PID and HOST: ccsfsapdb02. This software component will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software component SAP EHP1 FOR SAP NETWEAVER 7.3 : PI Adapter Engine (Java SE) - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is applicable for system SID: PID and HOST: ccros-sap-ap1, but the current system is SID: PID and HOST: ccsfsapdb02. This software component will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software component SAP EHP1 FOR SAP NETWEAVER 7.3 : AS Java Extensions - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is applicable for system SID: PID and HOST: ccros-sap-ap1, but the current system is SID: PID and HOST: ccsfsapdb02. This software component will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software component SAP EHP1 FOR SAP NETWEAVER 7.3 : Enterprise Services Repository - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is applicable for system SID: PID and HOST: ccros-sap-ap1, but the current system is SID: PID and HOST: ccsfsapdb02. This software component will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software feature SAP EHP1 FOR SAP NETWEAVER 7.3 : Application Server ABAP - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is not applicable for Java stack. This software feature will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software feature SAP EHP1 FOR SAP NETWEAVER 7.3 : Process Integration - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is not applicable for Java stack. This software feature will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Software component SAP EHP1 FOR SAP NETWEAVER 7.3 : Process Integration - 09 (10/2013) found in stack definition file /media/SP9-PID/stack.xml is applicable for system SID: PID and HOST: ccros-sap-ap1, but the current system is SID: PID and HOST: ccsfsapdb02. This software component will be skipped.

    Jan 3, 2014 2:08:04 PM [Warning]: Stack SAP EHP1 FOR SAP NETWEAVER 7.3 for product SAP EHP1 FOR SAP NETWEAVER 7.3 will be skipped as it contains no applicable software features.

    Jan 3, 2014 2:08:04 PM [Info ]: Parsing of stack definition file /media/SP9-PID/stack.xml has finished.

    Jan 3, 2014 2:08:04 PM [Error ]: Stack definition file /media/SP9-PID/stack.xml contains no applicable stacks.

    Jan 3, 2014 2:08:04 PM [Error ]: Cannot construct a support package stack from file /media/SP9-PID/stack.xml.

    Jan 3, 2014 2:08:04 PM [Error ]: The given /media/SP9-PID/stack.xml xml file cannot analyzed for the Support Packages Stacks.

    Jan 3, 2014 2:08:04 PM [Info ]: Scanning Inbox for stack definition files has finished.

    Jan 3, 2014 2:08:04 PM [Info ]: Found 0 applicable items.

    Hope help,

    Jose Maciel

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Jose,

      Thanks for sharing your information !!!Let me share mine too 😊

      long back i faced this issue and alternatively i used JSPM and SPAM for upgrade for PI in NW7.31 .

      exact RCA i have done on this later after my upgrade done successfully :

      The SLD was having issues in sending data to LMDB and further i upgraded CIM and CR content .

      Then i have faced same kind of issue while building a new system(NW 7.4) and i used development system xml file and did the upgrade by reading few scn threads on the SAP note 1600302 - MOpz: Copy stack xml with a report & did few changes with SID and hostname with notepad too on the xml file and in SA38 .

      Regards

      Ram

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.