Strange behavior deletion of preqs in R3 from APO

Hello all

I was wondering if anyone has ever seen anything like this.

We have externally procured materials (bought from a vendor outside the company) in APO. We enter a forecast(PIR) in R3 and CIF this to APO. Then we run planning in APO which generates purchase requisitions that are then sent to R3 via CIF.

Now, once per day we replan all of these materials via batch heuristic. Also the materials are set to automatic planning in the planning procedure (meaning when there are changes on the material planning will execute. Both of these actions may lead to deletion and recreation of purchase reqs since the requirements may have changed.

What we are seeing is that at times the already existing purchase requisitions in R3 do not get deleted although they're removed OK in APO.

At the same time newly created preqs in APO arrive fine in R3, this is the same if you try to make a preq manually and then remove it by hand in APO.

The integration seems to work fine if you test it, so there does not seem to be any master data or general interface issues.

However, over time, the preqs in R3 do not get removed as i wrote, and this leads to preqs building up in R3 compared to APO.

We can work around this by running the reconciliation report on the material and transfer the missing preqs to APO, then if we afterwards run planning to clean up the excess the preqs in R3 do in fact get deleted.

So my question is. What on earth could cause APO to "lose control" of purchase requisitions in R3? It does not happen for all of our materials, but it seems to happen regularly and we have to constantly do this cleanup in order to keep the problem in check.

Any ideas?

Regards

Simon Pedersen

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Feb 26, 2013 at 09:02 AM

    Hi Simon,

    Did you checked APO outbound queue, if they are getting transferred correctly.

    Also if you have CIF error handeling activated, check there if you gets some hint on this.

    It might happen, that queue are not able to be transferred from APO to ECC for PREQ deletion.

    Do let me know if you find anything there.

    Rgds

    Sourabh

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      I've reported it to SAP. They won't really get involved unless we can show them a reproducable example. And we currently don't have a way to do that.

      This process runs totally standard, no changes or badis. The only strange thing might be that we run an old APO 4.1 install on old hardware. We will be upgrading this to 7.02 with new hardware too in a few months so perhaps that will help.

  • Posted on Feb 28, 2013 at 01:45 PM

    Hi Simon,

    you always can get inconsistencies when two or more people (or jobs) ar working on the same data.

    Maybe a user is working on the data while the plannign run is scheduled.

    Regards.

    Hubert

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      This is something we're looking into also. The plant being replanned also runs CTP for all of the materials. So it is indeed likely that a material could be CTP planned during the planning run, generally this happens when a user ATP checks an SD order.

      But, since our systems are used globally (Americas-Europe-Asia) there is really no time slot where we can't potentially get CTP executing.

  • author's profile photo Former Member
    Former Member
    Posted on Mar 01, 2013 at 06:47 AM

    Hi Simon,

    What is the Sequence of the Batch job you are running? Are these confirmed PREQs or stock transport requisitions?

    Sometimes, the change pointers are created as "R" but does not get deleted in ECC. or run RLCDELETE ( do not run this). but if you could let me know the job sequence , then we may be able to figure out.

    we have created a Z program to delete these preqs from pulling out the data from APO while reconciling.

    Regards,

    Rorie

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Just after your netchange or Deployment is run and before C5, go to /sapapo/c5 transaction and give that part# and see if you have change points with method "C" and "R".

      The PREQs which are not getting deleted is only because you need to set up the jobs in the right sequence. or create a Z program for deletion of PREQS which is only in ECC.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.