cancel
Showing results for 
Search instead for 
Did you mean: 

Creation of anInspection lot for Inspection type 08 only in case the Material comes from a certain Plant

Former Member
0 Kudos

Dear,

We have a scenario in which we receive a Material (from Purchase orders) in Plant 8999 (without QM).

Later we transfer (Movement type 301) this Material from Plant 8999 to either Plant 8100 or Plant 8800.

Because Inspection type 08 is set in the Material (for both Plants 8100 and 8800), this Transfer posting triggers the creation of an Inspection lot.

This is desired, however, if we do a Transfer posting (also Movement type 301) from Plant 8100 to Plant 8800 or vice versa we DON'T want an Inspection lot
to be created.

Does anyone know how we can configure this in SAP (without an additional copy of Movement type 301)?

Meaningful answers will surely be rewarded with points!

Kind regards,

Bart

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Copy of mvt type would have been good option.

but still if you want to explore any other option then,Use exit

QAAT0001 where you can check MSEG-BWART and dependent on the value set the flag E_NO_INSPECTION which will avoid that an inspection lot is created.

I have not tired it but I am sure this will work.

Answers (1)

Answers (1)

former_member620323
Active Contributor
0 Kudos

Hi,

If you dont want Inspection lot while transferring plant to plant transfer via. Mov. type 301, then you can tick the QM deactivation field.

Go to OMJJ -> enter Mov. type 301 & then click on Deactivate QM inspection -> tick infront of 301 mov. type.