Plant Maintenance User Status Based BW Reporting

Former Member
0 Kudos

Hello -

Background : Plant Maintenance in ECC has a System Status and a User Status at the Order Head Level.

The questions are related to USER STATUS and not System Status

Questions:

1. Has anyone got examples of type of BW reports developed using the 'User Status' Field'. The reports could be operational or a KPI

2. Has anyone ever used User Status in reporting on Work Order Backlog.

    If so:

    - What was the need to use User Status (vs. some combinaiton of Order Type, System Status, PM Activity Type)

    - Since there can be multiple user statuses at the same time on the Work Order, what did the Selection Screen look like

THANKS IN ADVANCE

- ap

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

User statuses are different steps which client wants to maintain in a work order, which either denotes whether a step has been completed or it has dependent steps needs to be performed.

As far as BW usage or analytics based on this seems to be varying.

I don't have any example but I remember working on these combined with project systems.

Which divides plan vs actual.

Cheers!