Material assignment in routings

Hi all,

I've created some routing groups (transaction CA01).

Now I would like to link some materials to the routings. Going in the routing header (CA02) there are 2 options (buttons):

- Material assignment

- Comp alloc

What's the diference between these 2 possibilities ?

Which one should I use ?

thank in advance for your help.

Fred

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jan 15, 2013 at 10:36 AM

    Hi,

    Please go through the below explanations

    Material assignments: Generally after creating a routing for one material or without material, you can assign the same routing to another material also. For this purpose the material assignment option will be used.

    Component allocation: This is for the allocation of the components of header material present in the BOM to the corresponding operations.

    Hope this clarifies. Revert back in case of further queries.

    Regards,

    Krishna Chandra

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.