Hello,

I need to know how can I see the Requirements Class field in R3 and how can i change it for several products?

If i change the field Requirements Class, the field check mode will change in APO, right?

Cheers!


Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 15, 2013 at 06:26 AM

    Hi AI,

    I need to know how can I see the Requirements Class field in R3 and how can i change it for several products?

    In R3 requirement class is linked to product via strategy group, which has planning strategy in it and that planning stretagy has requirement class and type assigned to it, so you can change it for products with same strategy group.

    Go and change the requirement class in strategy group and the same will be changed.

    If i change the field Requirements Class, the field check mode will change in APO, right?

    Yes requirement class is known as check mode in APO, so after changing the requirement class in R3 you need to CIF the material again to APO, then the new check mode will be reflected in APO product master.

    Rgds

    Sourabh

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi AI,

      It is not me who will close the thread,it is the person who has created the thread need to close the thread.

      If the question is been answered correctly then choose correct answer, so that if somebody else have similar question can refer the same.

      Or you can choose assumed answered, if you are not sure about the correctness of given answers.

      You can also refer to SDN rules of engagement;

      http://scn.sap.com/docs/DOC-19331

      Rgds

      Sourabh

  • author's profile photo Former Member
    Former Member
    Posted on Jan 14, 2013 at 09:20 PM

    Al,

    Requirements class is not directly assigned to Material Masters.

    Look in the Material Master for the Strategy Group (MM03 > MRP3 tab). Once you know the Strategy Group, review this group to find the main strategy OPPT. Once you know the main strategy, review this in OPPS. The Requirements Class found under Customer Requirements section is the one that will normally be CIF'd to APO product Masters.

    Best Regards,

    DB49

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.