Business System not updating in Integration Builder

We have just recently moved over to our new DEV and QAS ECC systems after our SLO unit of measure conversion. Our DEV ECC and PI systems are not having any issue communicating, but for some reason our QAS PI system is having issues talking with our QAS ECC system.

I have narrowed it down to the fact the the business system in the integration builder of the QAS PI system is not updating with the correct information from the SLD. I have attached screenshots of the business system from the SLD as well as the Adapter-Specific identifiers of the business system from inside of integration builder.

I have refreshed the cache in the integration builder, in SXI_CACHE as well as DIR in PI.

Business system in SLD

Business system in Integration Builder

Runtime Cache in sxi_cache

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • Best Answer
    avatar image
    Former Member
    Jan 15, 2013 at 01:30 PM

    What I ended up doing was deleting the business system from the SLD, refreshing all caches, re-adding the business system, refreshed the caches again and the business system is now showing up correctly in Integration Builder.

    So now, I seem to be back to my original problem, in my ECC system in SM58, I'm getting the message "No service for system SAPQE2, client 212 in Integration Directory.".

    Any thoughts on how to resolve this?  Historically this was caused by the business system not having the correct SLD data in Integration Builder.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jan 15, 2013 at 04:11 PM

    My issue has finally been resolved, I had forgotten to activate my changes to the business system in Integration Builder.  Thank you both for your help.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hello,

      I suggest to set this last as "correct answer" 😊. In addition, if business system can't be deleted due to non-empty where used list (e.g receiver determinations), I suggest to rename them temporarily and delete the originals.

      Activating the corresponding change-lists, all caches get updated.

      Cheers,

  • Jan 14, 2013 at 04:31 PM

    can you check by running the report SAI_CACHE_REFRESH in PI and ECC?

    1740953 - Logical system Name vanished in Business System of SLD

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jan 14, 2013 at 08:36 PM

    Hi Tony,

    in the window "Adapter-specific message attributes", there is a button in the lower left corner to refresh the data from SLD. You have to be in edit mode to be able to click the button. After clicking the button, you have to close the business system and open it up again. In case it doesn´t work you might have to choose "Environment -> Clear SLD Data Cache" from the menu and perform the mentioned steps again.

    For me this always worked.

    Regards,

    Matthias

    Add comment
    10|10000 characters needed characters exceeded

  • Jan 15, 2013 at 09:17 AM

    Hi Tony,

    I would also suggest the same as Matthias. Along with that can you please check if the Builder is connected to the right SLD by checking the tcode "SLDCHECK".

    Thanks

    Abhishek

    Add comment
    10|10000 characters needed characters exceeded