Skip to Content
author's profile photo Former Member
Former Member

Set Plant as DC in ECC

we have 10 Plant in the ECC , 1 of them is Production Plant and the others are Distribution Centers, when i transfer a Material assign to Plant 1000 (Production Plant ), and to 1100 ( DC Plant ), to APO , it was transfered assigned to two locations 1000 , 1100 of type 1001 and not 1001 & 1002, then how to force from the ECC to set the other Plants as DCs.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 11, 2013 at 12:49 PM

    Hi Omar,

    Please follow below path to set your plant as distribution center in ECC system before ciffing to APO.

    After you set your plant as DC here, and ciffed to APO, your plant will appear as distribution center in apo.

    Hope this helps, please close the thread if it does.

    Rgds

    Sourabh


    DRP.JPG (80.0 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.