Hi Gurus,

My client wants to implement Bank communication management( FSCM ).

Our requirement is to have the approval process( workflow ) after we have the proposal run and not after the payment run.

Is it possible???

And what are the steps need to be followed for this.

And if the approval process comes into effect after payment run through APP,

then the system will generate a reverse document for every clearing document once the batch got rejected.

Won't it be a mess...??

(we can postpone the payment however the clearing document already got posted in the system, is it a right thing to do.....???).

Please reply ASAP.

Any input will be highly appreciated.

Thanks

Anand

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 20, 2012 at 11:37 PM

    I also have same requirement from our client for implementing approval workflow process before payment run and after proposal run. any input are most welcome.

    we currently already have BCM. however we have currently not there any Approval workflow in place. currently we are doing BCM approvals after payment run and before payment file gets created and following BCM approvals, payment files are being sent to Bank.

    Regards,

    Jignesh

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Chandra Sekhar Ija

      Hi Chandrasekhar,

      Thanks for your reply.

      For 2x control for a batch amount of 500000 to 2500000, in "change and release" node what should be the settings and what is the settings needed in Additional release strategy node..

      Same for 3x control...(if the batch amount is more than Rs 2500000, 3x control is needed..)

      Can you please explain it in detail..(step by step for the approval process only)...

      Thanks

      Regards

      Anand

  • author's profile photo Former Member
    Former Member
    Posted on Dec 28, 2012 at 07:05 AM

    Hi,

    In Bank Communication Management please note the following points :-

    1) Approval mechanism will work after the payment document has been generated.

    2) On rejection the payment document, the document needs to be manually reversed in Financial Accounting

    3) You can have one reviewer and multiple approvers based on value limits i.e. say upto USD 1M (1 reviewer and 1 approver), from USD 1.01 M to 5M (1 reviewer and 2 approvers)

    4) Approval / Rejection happens at batch level rather than individual line item level.

    5) Reviewer can approve / reject at line item level.

    Hope the above points help.

    Warm regards,

    Akhil Poddar

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Enes Yalcin

      Hi Enes,

      we have discussed with SAP on possible solutions on same and after dicussion with SAP and business, our business has excluded this requirement from scope as it is extending project time lines.

      so, we did not implement the solution.

      Regards,
      Jignesh

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.